Green Mountain Coffee Roasters

GreenMountain-1

INTRODUCTION:

As a part of the Green Mountain Coffee Roasters Williston facility expansion, a series of heavily-loaded tank foundations were required for the new Wastewater Pretreatment system. The tanks covered an approximate area of 42-ft by 48-ft and were positioned immediately adjacent to the existing plant.

Geotechnical Conditions:

A 12-foot thick crust of medium dense sand and silt was encountered at the site. However, the medium dense crust was underlain by very soft to firm silty clay extending to depths of more than 50 feet. The silty clay exhibited SPT N-values ranging from WOH to 5 bpf. Competent glacial till was found below the clay at depths of 55 to 60 feet below grade. Groundwater was 5 to 10 feet below grade.

Project Challenges:

Providing support and settlement control for the heavy areal tank loads over the very soft clay.

Advantages

  • Cost savings over traditional deep foundations
  • Flexibility of installation from various grades and locations
  • High capacity for reduction of scope
  • Rapid installation

Design and Construction Solution:

The design team was originally considering Geopier ground improvement for support of the large areal tank loads. However, alternative solutions were needed to address the deep, very soft clay soils. A Ductile Iron Pile solution was developed to provide support for tank foundations. Piles with working loads of 100 kips were designed to develop capacity in the glacial till at depths of 60 feet.

GreenMountain-loadChart

Load testing of the DIP solution showed less than 0.5 inches of deflection at the 100% design load. The test was performed to 200% where a deflection of slightly over 1 inch were recorded. The test results showed that even after loading to 200 kips, the amount of permanent deflection or set of the pile was only about 0.1 inches – thereby offering a highly controlled load-deflection response characterized by elastic shortening of the pile

Project Team Members

DIP Design/Build Partner: Helical Drilling, Inc.
Geotechnical Engineer: Knight Consulting Engineers, Inc.
General Contractor: Engelberth Construction, Inc.
Structural Engineer: Hixson, Inc.

Project

Green Mountain Coffee Roasters

Pile Type

End-bearing

Location

Williston, VT

Project Type

Commercial

Applications

Foundations
Tanks

Challenges

Soft Soils

Case Study File

Download

Related Projects

This is the contact for Helical.

×

Considering Ductile Iron Piles? Reach out for a project feasibility today!